Menu
Categories

Rollaway 250

per page
Set Descending Direction
  1. 816G Connection Pin
    816G Connection Pin
    Lead Time 2-3 Days
    £6.50 £5.42
  2. Surface Mount Guide Rail 716/Z3F
    Surface Mount Guide Rail 716/Z3F
    Lead Time 2-3 Days
    £37.79 £31.49
  3. Stop P
    Wall Mounted Door Stop P
    Lead Time 2-3 Days
    £16.79 £13.99
  4. Cement Fix Guide Rail 816/Z3F
    Cement Fix Guide Rail 816/Z3F
    Lead Time 2-3 Days
    £44.23 £36.86
  5. Galvanised Wheel With Internal Support Bracket "1/2 Round" Groove - 16mm Round Track
    Galvanised Wheel With Internal Support Bracket "1/2 Round" Groove - 16mm Round Track
    Lead Time 2-3 Days
    £17.03 £14.19
  6. Side Fix Bracket 250/A27
    Side Fix Bracket 250/A27
    Lead Time 2-3 Days
    £6.24 £5.20
  7. Top Guide Channel 250/27
    Top Guide Channel 250/27
    Lead Time 2-3 Days
    £56.80 £47.33
per page
Set Descending Direction

Bottom Rolling door system designed for medium sized industrial and commercial steel doors. If your application is agricultural we would recommend Rollaway 500. The Rollaway 250 kit is not recommended for high wind load areas.

Specifications;

Max Leaf Weight: 250kg
Max Leaf Width: 2000mm
Max Leaf Height: 3500mm
Minimum Door Thickness: 44mm

 

  Rollaway Roller Close Up